根据澳大利亚建筑规范委员会(ABCB)的澳大利亚国家建设法规(NCC)议定书,澳大利亚标准协会FP-020技术委员会已开始对AS 3959,易发生林火区域的建筑物草案的影响进行了初步分析,并以初步影响分析(PIA)草案的形式进行分析。
要修订NCC引用的文件,ABCB需要先做影响的初步分析(PIA),因为AS 3959是NCC第一卷和第二卷中当前引用的文件。PIA 要求确认问题的性质和影响程度,考量解决问题的所有可行办法,并对考虑的所有方案进行成本效益分析。此外,在ABCB的建筑规范委员会审议时,可以引用 PIA来支持这项提议。
澳大利亚标准协会正在征求所有方面对PIA中“咨询问题”的答复。这有助于确定问题的性质和影响程度以及备选方案2可能产生的影响。请参见下面的PIA。欢迎在2017年11月22日前,把对问题的答复通过电子邮件发送给项目经理Damith Rupasinghe,收件邮箱Damith.Rupasinghe@standards.org.au。所有答复都会用于最终的PIA。
公众意见的征询流程仍遵守澳大利亚标准协会公众评论的程序。公众可访问“AS 3959草案”,并通过我们的公众评论门户提交评论。所有意见必须在2017年11月22日之前提交。联系人:利益相关者经理Ron Pulido:02 9237 6077。
Seeking comments on early-stage analysis of the impacts associated with draft changes to AS 3959, Construction of buildings in bushfire-prone areas
In accordance with the Australian Building Codes Board’s (ABCB) Protocol for NCC Referenced Documents, Standards Australia’s technical committee FP-020 has developed an early-stage analysis of the impacts associated with draft changes to AS 3959, Construction of buildings in bushfire-prone areas in the form of a draft Preliminary Impact Analysis (PIA).
The ABCB’s PIA process is a requirement to make changes to documents referenced by the National Construction Code (NCC). AS 3959 is a current referenced document in NCC Volumes One and Two. The PIA requires the identification of the nature and extent of the problem, consideration of all feasible options that address the problem, and a cost-benefit analysis of all options considered. Also, it will be used to support the proposal to reference when considered by the ABCB’s Building Codes Committee.
Standards Australia is seeking responses from all interested parties on the ‘Consultation Questions’ contained in the PIA. This will assist in establishing the nature and extent of the problem and the likely impacts of Option 2. See PIA below. Responses to the questions are invited until 22 November 2017 and can be emailed to Damith Rupasinghe, Project Manager at Damith.Rupasinghe@standards.org.au. All responses will be used to inform the final PIA.
The public comment process remains subject to Standards Australia’s public commenting procedures. Access the AS 3959 draft and submit comments through our Public Comment portal. All comments must be received by 22 November 2017. Contact Ron Pulido Stakeholder Engagement Manager 02 9237 6077